Clifton, QLD
Pump Station installed, connected and commissioned in 3 Days!!
System
Sewer pump station with Grinder pumps, replaced in Clifton QLD, with integral valve chamber.
Challenges
As this was a live site, the new station had to be installed and commissioned in the shortest space of time.
Solution
A QMax pre-cast pump station, with pre-manufactured pipework etc. Extended cover slab with cast in conduits allowed for this to be completed in the required time frame.