Project Name:
Mackay Park
Client:
Location:
Mackey NSw
Year Completed:
Our client required a system installed that could operate as a pumpout system, then converted into a pump station after additional connecting services were available.
Currently operating as a solar powered IOP system, that will send SMS messages to pump out trucks when tank requires emptying.
Once the rising main and incoming power are available, the pump station will be fitted our with pumps and controls and will be commissioned as an operational SPS.
With changing requirements, QMax needed to adapt our offer to meet the clients requirements, including design, initial and future, manufacture and installation works including civil excavation, de-watering, backfilling and compaction.
While it creates a lot of pressure on our team, it is always worth it when the project is completed and handed to the client.
Get updates from us by subscribing to our newsletter
Solutions
Contact
Location
72 High St,
Queanbeyan, NSW 2620
Level 6, 10 Herb Elliott Drive,
Sydney Olympic Park,
NSW 2127
Copyright © 2025