Parliament House

Parliament House

Project Name:

Parliament House

Client:

Location:

Canberra ACT

Year Completed:

HAVE A SIMILAR
PROJECT IN MIND?

TALK TO OUR EXPERTS

Challenges

Determining existing pump performance and matching this to a new multi pump system. We needed spare capacity for possible increased future demand, however we needed to also optimise energy usage.

Solutions

  • Searched archives and located existing pump performance curves.
  • Used pressure readings and pump speed to establish flow rate.
  • Matched performance with new booster pumpset.
  • Liaised with APH staff to determine their ultimate requirements.
  • Used our experience with flush valves to program pump performance parameters and get system operating efficiently and to our Client’s satisfaction.
  • Connected standard product fault outputs to APH Modbus system.
  • Carried out after-hours DN150 water main cut in.
  • Installed new DN150 testable double check valve with isolation valves to run system on mains pressure in periods of low demand.

Outcome

Replaced 2 inefficient pump systems with 2 new high efficiency systems to reduce energy consumption.

Installed mains water bypass so that during periods of low demand, no energy is required to supply the building.